How Gaddiel Industries delivered an 8′ 2″ PUF ceiling height in a Modular OT where a mid-room RCC beam made even 7′ 6″ seem unachievable — through a custom-engineered Laminar Airflow solution.
A hospital in Dwarka, New Delhi approached Gaddiel Industries for the design and installation of a Modular Operation Theater (MOT). The OT room had a generous floor area in terms of length and width — well-suited for a fully equipped surgical environment. However, the structural reality of the space presented a significant constraint that immediately raised concern for the operating doctor.
The RCC slab height was 9 feet 6 inches — reasonable for most builds. But a load-bearing RCC beam ran across the ceiling, with its bottom surface at just 8 feet 6 inches from the floor. Critically, this beam was positioned almost centrally through the OT — directly over the surgical zone where the Laminar Airflow (LAF) unit would need to be installed.
In Modular OT construction, the Laminar Airflow (LAF) ceiling unit is the most critical component. It delivers HEPA-filtered, ultra-clean unidirectional airflow directly over the surgical table — and it typically requires 16 to 18 inches (1.3 to 1.5 feet) of vertical clearance to hang below the PUF ceiling. The challenge was clear:
“The doctor was very apprehensive. With the beam at 8′6″ and a standard Laminar Airflow unit hanging 1.5 feet below — his expectation was a maximum of 7 to 7′6″ ceiling height. For a surgeon who would be operating in that space for hours, it was a genuine concern.”
The conventional approach would have left the OT with a cramped 7 to 7.5-foot ceiling — below the ideal surgical environment standard and uncomfortable for the medical team. Removing or modifying the RCC beam was structurally not an option. A creative, technically sound solution was needed.
These photos capture the above-ceiling zone during construction — showing the RCC beam, the custom ductwork routing, and the modified laminar airflow unit being precisely positioned to embed within the beam depth rather than hang below it.
When our team conducted the site survey and understood the constraints, we recognised this as a challenge we encounter and solve once or twice every month. Our response to the doctor was confident and direct: "We can give you 8 feet 2 inches to 8 feet 3 inches of PUF ceiling height — without touching the beam."
“When we told the doctor we could achieve 8′2″ to 8′3″ ceiling height, he was very surprised and asked — ‘How? Will you remove the beam?’ We said, no. The beam stays exactly where it is. We will customize the laminar airflow unit itself.”
Our team conducted a detailed site survey — measuring the RCC slab height (9′6″), the beam bottom (8′6″), the beam width, and the exact central position of the beam relative to the surgical zone. This data drove every subsequent engineering decision.
Rather than using a standard off-the-shelf LAF unit (which would hang 16–18 inches below the PUF ceiling), Gaddiel designed and manufactured a custom LAF unit with a compressed depth of just 16 inches — engineered specifically so that the unit body would embed partially into the beam depth, straddling both sides of the beam. The beam effectively became part of the LAF housing structure.
The customized LAF unit was designed so the beam ran through the upper section of the unit body. The LAF unit enclosed and integrated the beam within itself — with the bottom diffuser face projecting no more than 4 inches below the PUF ceiling level. The beam, rather than being an obstacle, became a structural anchor for the LAF unit.
With the LAF unit embedding the beam and protruding only minimally below ceiling level, the PUF ceiling was installed and finished at 8 feet 2 inches — surpassing even our committed figure of 8′2″ to 8′3″, and exceeding the doctor’s best expectation of 7 feet by a full 14 inches.
The project was completed with all standard Gaddiel Modular OT components — antibacterial PUF wall & ceiling panels, seamless epoxy-filled joints, HEPA-filtered laminar airflow, hermetically sealed HPCL sliding doors, conductive anti-bacterial vinyl flooring, OT pendants, peripheral LED lighting, and medical gas outlets — all within the elevated ceiling space.
By re-engineering the Laminar Airflow unit from scratch, Gaddiel converted a structural limitation into a delivered ceiling height that exceeded the doctor’s best expectation by over a foot.
The finished Operation Theater speaks for itself — a spacious, clinical blue environment with an 8′2″ ceiling, fully equipped with HEPA-filtered laminar airflow, surgical lights, OT pendant, hermetic door, and antibacterial vinyl flooring.
The doctor, who had been apprehensive throughout the pre-installation phase, was visibly overwhelmed upon seeing the completed OT. He had walked in expecting a claustrophobic 7-foot ceiling and was standing in an open, well-lit surgical environment with 8 feet 2 inches of clear head space above the PUF ceiling — with the HEPA Laminar Airflow unit fully functional above.
His response went far beyond satisfaction. He rewarded the Gaddiel team with a financial incentive, personally recommended Gaddiel Industries to peers in his professional network, shared the project on his hospital’s website, and posted about Gaddiel’s work across his WhatsApp groups — generating unsolicited word-of-mouth referrals for the company.
“Doctor was so happy that he gave us an incentive, recommended us to his friends, posted about us on his website, and shared in his WhatsApp groups. This is what we strive for — not just completing a project, but solving the problem that matters most to the doctor.”
This project is not an exception — it is a reflection of how Gaddiel Industries operates. Structural ceiling constraints, low beam heights, mid-OT obstructions, and tight floor plans are challenges our team encounters and resolves once or twice every month across India. Our in-house manufacturing facility in Mohan Nagar, Ghaziabad gives us the flexibility to custom-design, modify, and fabricate any component — including the Laminar Airflow unit — to meet site-specific requirements that no off-the-shelf product can address.
With over a decade of experience and successful Modular OT installations at Apollo Cradle, Apollo Spectra, Indira IVF, Birla Fertility, Military Hospitals, and many more across India, Gaddiel brings both the technical depth and the problem-solving mindset that complex surgical infrastructure demands.
Manufacturer & Installer of Modular OT, Modular ICU, Modular IVF, Medical Gas Pipeline Systems & Hospital Infrastructure
📞 +91-9891065150 | +91-9911015270 | 0120-4124265
📧 infogaddiel@gmail.com | 🌐 www.gaddiel.in
G-1, Ground Floor, Plot No. 48, Naveen Park, Sahibabad, Ghaziabad (U.P.) – 201005
Registered Office & FactoryPlot No. 81, Near Laxmi Steels, Rajender Nagar Industrial Area, Mohan Nagar, Ghaziabad (U.P.) – 201007
© 2024 Gaddiel Industries. All rights reserved. | Delhi • Mumbai • Hyderabad • Bangalore • Kolkata • Ranchi • Ahmedabad
WhatsApp us