The cost of installing a medical gas pipeline system (MGPS) in a hospital depends mainly on the number of beds and outlets, the gases you need, the length of copper pipework, and the source equipment such as manifolds, a liquid oxygen tank, compressors and vacuum plants. There is no fixed per-bed price, because a 30-bed nursing home with oxygen and suction in a few rooms is a very different project from a 200-bed hospital with ICUs, OTs and a central oxygen plant. This guide explains what drives MGPS cost, how to plan the system, and how installation is carried out step by step.
If you are new to the term, our guide to the MGPS full form explains what the system includes. Here we focus on planning and installing one.
A complete medical gas pipeline system has four parts that are planned and priced together:

| Cost factor | Why it matters |
|---|---|
| Number of beds and outlets | Each outlet needs a terminal unit, pipe drop and fittings. ICUs and OTs need far more outlets per bed than general wards. |
| Gases required | Oxygen and vacuum are the minimum. Adding medical air, nitrous oxide, carbon dioxide, surgical air (7 bar) or AGSS adds pipelines and plant. |
| Oxygen source | Cylinder manifolds cost less to set up. A liquid oxygen tank or PSA plant costs more upfront but lowers running cost for larger hospitals. |
| Pipe length and building layout | Number of floors, distance from the plant room and the route through shafts and ceilings decide how much copper and labour is needed. |
| Alarm and monitoring level | Basic pressure gauges cost less than digital area alarms and a central medical gas monitoring system. |
| New build or running hospital | Installing during construction is simpler. Retrofitting a running hospital needs night work, phased shutdowns and more protection. |
| Brand and standards | Outlets, valves and alarms built to recognised standards (such as ISO 7396-1 and HTM 02-01) cost more than unbranded parts, but they are safer and easier to get approved. |
Good planning keeps the system safe and avoids paying twice for changes. Before you request a quotation, prepare the following:
Gaddiel’s team can prepare this layout as part of hospital designing, so the MGPS, interiors and modular OT are planned together.
Timelines depend on hospital size and site readiness. In a new building, pipework is laid in stages as each floor is ready, and the plant room and testing are completed before the hospital opens. In a running hospital, work is usually phased ward by ward to keep patient areas in use. A clear layout and early decisions on gases and the oxygen source are what keep the schedule on track.
If you are planning a new hospital or upgrading an existing one, share your floor plans with us for a site-specific MGPS layout and quotation. We install medical gas systems across India, including MGPS in Delhi and MGPS in Mumbai. You can also read about NABH standards for medical gas pipelines.
Planning a Modular OT, MGPS or Nurse Call project?
Talk to Gaddiel’s engineers for a free consultation and a clear, itemised quotation.
Get a Free Quote WhatsApp Us Call +91 99110 15263There is no fixed rate. The cost depends on the number of beds and outlets, the gases required, the oxygen source (cylinder manifold, liquid oxygen tank or PSA plant), pipe length and the alarm system. Share your floor plan with an MGPS supplier for an accurate, itemised quotation.
Oxygen and medical vacuum are the basic gases. Larger hospitals also pipe medical air, nitrous oxide, carbon dioxide, surgical air for power tools, and an anaesthetic gas scavenging system (AGSS) in operation theatres.
Medical-grade, degreased and capped copper pipe is used, with joints brazed under nitrogen purging so that no oxide forms inside the pipe.
Yes. Installation is planned in phases, ward by ward, often with night work and temporary oxygen supply, so patient care continues during the work.
Before handover, the system is pressure and leak tested, checked for cross-connections so each outlet delivers the right gas, flow tested and checked for gas purity. Test certificates and as-built drawings are given to the hospital.